seniorpropertiesgb.co.uk

 
   
Romanian Project Commercial  
Click here for property details
POA - 0

Romanian Project
4P Renewables
Alba Iulia 158MWdc – Project Teaser
Key project advantages.
Investment highlights.
Derisked grid access: ATR Secured, Connection
Contract signed
Low grid connection tariff: EUR 6.465/MWdc
Location is close to existing power station
Land secured for 35 years
Ready to build: Q3 2025
Option to add storage and increase returns
Highly experienced development company
NIKOLAS BAUTISTA
AMANDA C. ROFLES
Location Details
Alba Iulia site is located in central Romania, Alba County
Land: cca. 180 ha, 4.4 km distance from Alba Iulia power station
Lease: 35 years, EUR 2000/ha/year
Technical Specs
PV Project. Installed power of 158.4 MWdc
Power & Production
Grid Connection
Installed Power: 158.4 MWdc
Specific Production: 1320 kWh/kWp/year
Estimated Production: 209 GWh/year
Connection: 220/110/20 kV station
Alba Iulia, 4.4 distance from the project
Grid connection tariff (Tr+Ti+Tu):
EUR 1.024.000, i.e EUR 6.465/MWdc
Development Status Developer Deal Structure
Obtained: ATR, PUZ, Environment, Culture,
Utilities, ANIF, Health, Defence, Police, etc
Ongoing: Agriculture, Building Permit,
others
RTB: Q3 2025
Milestone linked share deal
Development company: experienced
investment and project development
company with combined more than
3GW in development
Alba Iulia Project
Layout
01
Access Roads
DN 1, local roads
02
Landscape Details
Predominantly hilly, various levels of elevation
PVsyst Analysis
Alba Iulia Project
Performed by EnergoBit
Geographical Site
Bărăbanț
Romania
Meteo Data
Bărăbanț
Meteonorm 8.0
Situation
Latitude 46.12 N
Longitude 23.60 E
Altitude 388 m
Time zone UTC+2
Project Settings
Albedo 0.2
Grid Connected System
PV Field Orientation
Fixed Plane
Tilt/Azimuth 33/-1°
User’s Needs
Unlimited load (grid)
System Information
PV Array
Nb. of modules 263940 units
Pnom total 158.4 MWp
Sheds On Ground
Near Shadings
Linear Shadings
Inverters
Nb. of units: 800
Pnom total: 140.0 MWc
Pnom ratio: 1.131
Produced Energy
209 GWh/year
Specific Production
1320 kWh/kWp/year
Perf. Ratio PR
85.13%
Project Acquisition Outline
Confirmation of Project
Interest
Signed NDA and confirmation of
project(s) of interest
Non-Binding Commercial
Offer
Signed NBO
Drafting, Negotiation & Signing of
Transaction Documents
Parties align on timelines, final review and
signing of SPA
1 week
2 weeks
4 weeks
4 weeks
4 weeks
Preliminary Due
Dilligence
Clean Red Flag Due Dilligence
report by prospective buyer
Detailed Due Dilligence
Clear full DD reports from
client’s advisors
Execute agreed
milestones for the
transfer of the ownership
at RTB status
 
< back
Property Search
Residential | Commercial
Min Price Max Price
Number of bedrooms: