seniorpropertiesgb.co.uk

 
   
Romanian Project Grosi 65.5 MWdc Commercial  
Click here for property details
POA - 0

Romanian Project Grosi 65.5 MWdc
4P Renewables
Grosi 65.5 MWdc - Project Teaser
Key project advantages.
Investment highlights.
Derisked grid access: ATR Secured
Low grid connection tariff: EUR 9.246/Mwp
Location is close to existing power station
Land secured for 35 years
Ready to build: Q2 2025
Option to add storage and increase returns
Highly experienced development company
NIKOLAS BAUTISTA
AMANDA C. ROFLES
Location Details
Grosi site is located in North Romania, Maramures County
Land: cca. 80 ha, mostly flat, 2.5 km from Baia Mare power station
Lease: 35 years, EUR 1960/ha/year
Technical Specs
PV Project. Installed power of 65.5 MWdc
Power & Production
Grid Connection
Installed Power: 65.535 MWdc
Specific Production: 1343 kWh/kWp/year
Estimated Production: 88 GWh/year
Connection: 110 kV into existing Baia
Mare power station.
2.5 km distance from project site
Grid connection tariff (Tr+Ti+Tu):
EUR 605.932, i.e 9.246 EUR/Mwp
Development Status Developer Deal Structure
Obtained: ATR, PUZ, Environment,
Culture, Utilities, Defence, Health, others
Ongoing: Agriculture, various others for
building permit
RTB: Q2 2025
Milestone linked share deal
Development company: experienced
investment and project development
company with combined more than
3GW in development
Grosi Project
Layout
01
Access Roads
DC48, county and local roads
02
Landscape Details
Mostly flat, minor elevation.
PVsyst Analysis
Grosi Project
Geographical Site
Grosi
Romania
Meteo Data
Grosi
PVGIS api TMY
Situation
Latitude 47.618 N
Longitude 23.584 E
Altitude 197 m
Time zone UTC+2
Project Settings
Albedo 0.2
Grid Connected System
PV Field Orientation
Fixed Plane
Tilt/Azimuth 30/3°
User’s Needs
Unlimited load (grid)
System Information
PV Array
Nb. of modules 98550 units
Pnom total 65.54 MWp
Sheds On Ground
Near Shadings
Linear Shadings
Inverters
Nb. of units: 178
Pnom total: 53.40 MWc
Pnom ratio: 1.227
Produced Energy
88.02 GWh/year
Specific Production
1343 kWh/kWp/year
Perf. Ratio PR
87.74%
Project Acquisition Outline
Confirmation of Project
Interest
Signed NDA and confirmation of
project(s) of interest
Non Binding Commercial
Offer
Signed NBO
Drafting, Negotiation & Signing of
Transaction Documents
Parties align on timelines, final review and
signing of SPA
1 week
2 weeks
4 weeks
4 weeks
4 weeks
Preliminary Due
Diligence
Clean Red Flag Due Diligence
report by prospective buyer
Detailed Due Diligence
Clear full DD reports from
client’s advisors
Execute agreed
milestones for the
transfer of the ownership
at RTB status
100% of SPV transferred to
investor
 
< back
Property Search
Residential | Commercial
Min Price Max Price
Number of bedrooms: