|
 |
 |
seniorpropertiesgb.co.uk
|
|
 |
|
|
 |
Romanian Project Cheveresu |
Commercial |
|
 |
|
 |
 |
POA
- 0
Romanian Project Cheveresu
|
 |
4P Renewables
Cheveresu PV+BESS – Project Teaser
Key project advantages.
Investment highlights.
Derisked grid access: ATR Secured
Low grid connection tariff: EUR 25.896/MWdc
Grid connection agreement signing in April 2025
Land secured for 30 years
Ready to build: Q1 2025
Approved 5h storage
Highly experienced development company
NIKOLAS BAUTISTA
AMANDA C. ROFLES
Location Details
Cheveresu site is located in West Romania, Timis County
Land: cca. 47.1 ha, connected to Timisoara power station
Lease: 30 years, EUR 2000/ha/year
Technical Specs
Installed power PV 49.47 MWdc, Battersy 40MW/200MWh
Power & Production
Grid Connection
Solar Installed Power: 49.47 MWdc
Storage: 40 Mw/200MWh co-located
Estimated Production: 62.25 GWh/year
Connection: 110kV Timisoara power station
Grid connection tariff (Tr+Ti+Tu):
EUR 1.280.812, i.e 25.896 EUR/MWdc
Development Status Developer Deal Structure
Obtained: ATR, Environment, Culture,
Utilities, ANIF, Defence, all others
Ongoing: Building permit
RTB: Q1 2025
Share deal
Development company: experienced
investment and project development
company with combined more than
3GW in development
Cheveresu Project
Layout
01
Access Roads
Local roads
02
Landscape Details
Flat, no elevation.
PVsyst Analysis
Cheveresu Project
Geographical Site
Chevereșu
Romania
Meteo Data
Chevereșu
Meteonorm 8.0
Situation
Latitude 45.692 N
Longitude 21.473 E
Altitude 100 m
Time zone UTC+2
Project Settings
Albedo 0.2
Grid Connected System
PV Field Orientation
Fixed Plane
Tilt/Azimuth 25/0°
User’s Needs
Unlimited load (grid)
System Information
PV Array
Nb. of modules 78190 units
Pnom total 43.00 MWp
Sheds On Ground
Near Shadings
Linear Shadings
Inverters
Nb. of units: 179
Pnom total: 35.80 MWc
Pnom ratio: 1.201
Produced Energy
62.25 GWh/year
Specific Production
1448 kWh/kWp/year
Perf. Ratio PR
87.48%
Project Acquisition Outline
Confirmation of Project
Interest
Signed NDA and confirmation of
project(s) of interest
Non-Binding Commercial
Offer
Signed NBO
Drafting, Negotiation & Signing of
Transaction Documents
Parties align on timelines, final review and
signing of SPA
1 week
2 weeks
4 weeks
4 weeks
4 weeks
Preliminary Due
Diligence
Clean Red Flag Due Dilligence
report by prospective buyer
Detailed Due Diligence
Clear full DD reports from
client’s advisors
Execute agreed
milestones for the
transfer of the ownership
at RTB status
100% of SPV transferred to
investor
|
|
 |
|
 |
|
|
|